Installation Services: General Contractor Checklist

    Please fill out every field. If a field does not apply, insert a dash or type NA.
    TCS requires a minimum of two weeks lead time for installation after all items below have been confirmed.

    Site Address*
    Does the site have permanent power?* YesNo
    Are all HVAC units functional and operational with attached ductwork?* YesNo
    Are the walls finished at all remote sensor locations?* YesNo
    Do all thermostats, sensors, and override locations have 2″ x 4″ junction boxes installed with a 3/4″ pipe from each one extended above the ceiling space with a pull string?* YesNo
    Are the 2″ x 4″ junction boxes for the thermostats in the Manager’s office installed horizontally and 9″ center to center?* YesNo
    Are the 2″ x 4″ junction boxes for all remote room sensors installed vertically?* YesNo
    Has a three-phase 15 Amp circuit been provided and installed for powering the energy meter?* YesNo
    Has a wall outlet with 120VAC power been installed to power the QD2040 and Cellular Modem?* YesNo
    If the manager’s office where the thermostats are located has a hard lid, was an access door installed?* YesNo
    Have 120VAC lighting contactors been installed and wired to lighting circuits?* YesNo

    By filling out and submitting this form, you acknowledge that you are responsible for this project and that all information in this document is complete and accurate.